SERVICES PROVIDED |
CLIENT |
DESCRIPTION |
Structural Engineering |
SDA/Santos |
Mutineer-Exeter Subsea Field Devel. Design of Booster Pump Manifold Skid Foundation |
Structural Engineering |
SDA/Roc Oil |
Cliffhead Project. Design of Boat Landing Platform, Access Bridge, Reel Support Frame, Pullhead and Spooling Machine Support |
Structural Engineering |
SDA/Technip |
Enfield Development Area. Design of Riser Tower Towing Arrgt and Spool transportation supports |
Structural Engineering |
SDA/Technip |
Pohokura Offshore Platform. Lift Analysis of 2-inch Spoolpiece |
Structural Engineering |
SDA/Apache |
Simpson Pipeline Repair. Design of Installation Frame and Development of Repair Procedures |
Structural Engineering |
SDA/Apache |
Simpson Platform Riser Installation. Design of Riser Clamps and Development of Installation Procedure |
Structural Engineering |
SDA/Apache |
Bambra East Development. Design of SSIV Skid, Hot Tap Skid, Hang-off Clamp and Development of Riser Installation |
Structural Engineering |
SDA/Apache |
Harriet B Gas Lift Valve Installation. Design of Gas Lift Valve Skid Protection Frame |
Structural Engineering |
SDA/Coogee |
Montara Development. Design of 100T Manifold, Design of PLET’s, Design of Riser Base. |
Installation Procedure |
SDA/Apache |
Simpson Pipeline Replacement. Development of the Installation Procedure for the replacement of a section of pipeline |
Structural Engineering |
SDA/Linkweld |
Van Gogh Development. Design of Load Testing Beam for skid padeyes |
Structural Engineering |
SDA/Linkweld |
Centre Lift Spooler. Design of Lifting Frame for Spooler |
Structural Engineering |
SDA/Linkweld |
Design of Baskets for Drill pipe and Design of Lift Containers |
Structural Engineering |
SDA/Neptune Diving |
Air Diving LARS. Design of air diving Launch and Recovery System |
Structural Engineering |
SDA/Linkweld |
OTSG Temporary Boiler. Design of Installation Skid |
Structural Engineering |
SDA/Linkweld |
Pluto Field Development. Design of transportation Towers and Seafastening for Spoolpieces |
Structural Engineering |
SDA/Sea-struct |
Tyco Cable Protection. Mobile Crane de-rating calculations for use offshore |
Structural Engineering |
SDA/Neptune Geo |
Seafastening Design for ROV Spread |
Structural Engineering |
SDA/Neptune Marine |
Design of an ROV Launch and Recovery System |
Structural Engineering |
SDA/Linkweld |
Design of Testing Frame for Padeyes |
Structural Engineering |
SDA |
Ninian Southern Platform Repair. Habitat Lifting Frame Design and Strongback Design |
Structural Engineering |
KAI Boston |
Design of an ROV Launch and Recovery System |
Structural Engineering |
KAI/Diamond Offshore |
Design of modifications to the Anchor Bolster on the Ocean Worker Semi-submersible |
Third Party Verification and Discipline Checking |
SDA |
Discipline Checking and Third Party Verification of various analyses documents |
Structural Engineering |
DOF Subsea |
Forties Charlie to Delta Replacement Pipeline. Transportation analysis and seafastening design of replacement riser on Forties Charlie |
Expert Witness |
SDA |
Responsible for the review of the technical aspects relating to the design of concrete subsea mattresses in a dispute between the end user and the designer/supplier of the mattresses. Prepared a technical report for the lawyer of the end user. |
Peer Review Member |
Endeavor, Houston |
OML 26 Field Expansion |
Quality Assurance |
DOF Subsea |
Developed a revised Engineering Quality System for the company |
Structural Engineering |
DOF Subsea |
Development the VLS Functional Specification |
Peer Review |
Endeavor, Houston. |
Part of the team that carried out the review of the Gimboa Field Development |
Structural Engineering |
Neptune, Australia. |
Carried out the Design of 90’ Burnerboom on the Atwood Osprey |
Structural Engineering |
Neptune, Australia |
Installation and structural design of a 150 Ton Winch on Crest Odyssey 2 |
Structural Engineering |
DOF Subsea |
Part of the team on the development of Horizontal Lay System |
Structural Engineering |
DOF Subsea |
Part of the team involved in the Tordis Tampen Field Development |
Structural Engineering |
Cortez Subsea |
Responsible for the structural aspects of the Janice Alpha FPU Riser Recovery |
Due Diligence |
Bain and Co. |
Responsible for the technical due diligence on Bain’s client’s purchase of an EPCI company |
Third Party Verification |
DOF Subsea |
TPV on analyses documentation prepared by DOF Subsea |
Structural Engineering |
Neptune, Australia |
Wanadoo Casing Repair. Responsible for the structural and installation aspects of this repair |
Structural Engineering |
DOF Subsea |
Carried out various transportation analyses and seafastening designs on behalf of DOF Subsea |
Structural Engineering |
Neptune, Australia |
Carried out various transportation analyses and seafastening designs on behalf of Neptune |
Project Management |
Total Brunei |
ROV Survey of two pipelines and two jackets. The development of the contract and execution of the contract |
Third Party Review |
Bhagwan Australia |
TPV of Analyses documents associated with the Vessel Deck for Transportation of Items |
Third Party Review |
Rigmar UK |
Cromarty Firth Bridge Maintenance. TPV of contractor’s analyses documents and lift analysis documents associated with under-bridge Temporary Staging |
Third Party Review |
Rigmar UK |
Forth Crossing Maintenance. TPV of contractor’s analyses documents and lift analysis documents associated with under-bridge Temporary Staging |
Preparing Procedures |
The Ocean Clean Up |
Installation procedures for Boom tow and set-up |
Third Party Review |
Bhagwan Australia |
Review and verification analysis of a Vessel A-Frame and lifting beam |
Expert Witness Support |
N/A |
Provided technical support for reviewing the revised fabrication drawings and establishing the reasons for the changes and attributing these changes (where appropriate) to design company errors. Quantifying the effects of the changes in terms of materials, manhours, schedule and costs. Preparing suitable reports for the barrister. |
Third Party Review |
Consub |
ONGC Field Development, India. Responsible for TPV of Engineering Analysis Reports, Installation Analysis Reports, Installation Procedures, Fabrication Procedures and Drawings, FAT procedures, SIT Procedures and Drawings for structures and pipelines flowlines issued by the contractor to ONGC. |
Structural Engineering |
PDi Aberdeen |
Responsible for the transportation analysis and Seafastening design of the 4 MWA piles, the two riser bundles, the flexible riser reels and cradles and the Riser Deployment System. |
OUR TRACK RECORD
Tel. +44 (0) 7476 559957
“... delivering successful solutions”
_______________________________________________________________________________________________________________